    安装防火卷帘门需要技巧
    来源:http://www.xmyzcy.com   时间:2017-2-21 14:35:51
    在商场等公共场所中我们经常可以见到防火卷帘门,二面对其正确安装调试方法,作为防火卷帘门厂家我们也有必要为您做一个说明,让您可以用简单几步骤学会安装防火卷帘门。
    We can see the fire shutter doors often in shopping malls and other public places, two in the face of the correct installation and debugging, as fire shutter doors manufacturers we also need to make a note for you, so that you can install fire doors with a few simple steps to learn.
    1、我们需要按照设计型号先行查阅产品说明书以及电气原理图,并仔细检查产品表面处理以及零附件,并测量产品各个部位的基本尺寸,查看门洞口适不适合卷帘门尺寸,而且对于导轨和支架的预埋件位置以及数量也要仔细检查清楚。
    1, we need to design models to refer to the product manual and electrical principle diagram, and carefully check the product surface treatment and accessories, basic dimensions and measurement of various parts of the product, check the portal is suitable for rolling door size, but also to guide and support the position and the number of embedded parts should be carefully checked out.
    2、接下来需要测量洞口标高,并小心弹出两导轨垂线及卷筒中心线。
    2, the need to measure the elevation, and carefully pop two vertical guide rail lines and drum.
    3、这一步需要将垫板电焊在预埋铁板上,然后使用螺丝固定卷筒的左右支架来进行卷筒安装,正确的卷筒安装之后应该是可以灵活转动的。
    3, this step takes the plate welding in embedded iron plate, and then use the left and right bracket screw reel to reel drum installation, right after installation should be flexible rotation.
    4、安装减速器、传动系统、电气拴街系统,并空载调试防火卷帘门,然后将事先装配好的帘板安装在卷筒上。
    4, the installation of reducer, transmission system, electrical wiring system, and no load debugging fire shutter door, and then assembled in advance of the curtain board installed in the drum.
    5、接下来按图纸规定位置安装导轨并焊成以体,各导轨需要在同一垂直平面上,之后可以安装水幕喷淋系统,并与总控制系统连接。
    5, then according to the drawings specified position mounting rails and welded to body, the rail should be in the same vertical plane, can be installed after the water curtain spray system, and connected with the master control system.
    后进行防火卷帘门调试运行,先用手去试运行,再用电动机启闭数次,等到全部调试完毕之后进行防护罩的安装。
    Finally, the commissioning of the fire shutter door, the first hand to try to run, and then open and close the motor several times, until after the completion of all the commissioning of the protective cover installation.